November 19, 2026
Route 27 runs through Guachipelín, and it also divides the area's water supply. AyA told the Concejo Municipal de Escazú in March 2024 that homes south of the highway get water pumped from a well field across the valley. Homes north of it are on Puente Mulas, the largest system in the canton and the one under the most pressure. Two houses can share a district name and a price bracket and still draw water from different systems.
The Instituto Meteorológico Nacional expected the dry season to be established in the Central Valley during the week of November 16 to 22, 2026, with very dry conditions there and dry weather across the country into the first half of December. If you are comparing Escazú homes over the next few months, you will be looking during the period when the differences between these systems show.
AyA's presentation to the municipal council on March 11, 2024 describes Escazú as served by several separate potable water systems. Each one has its own source, its own area and its own balance between what it produces and what its customers use. The figures below are AyA's 2024 numbers, so read them as a snapshot from that year.
| System | Source | Escazú areas served | AyA's 2024 figures |
|---|---|---|---|
| Los Filtros | Treatment plant in San Antonio de Escazú | San Antonio and the south of the canton | 84.8 liters per second average production against 87.3 liters per second demand at the peak of the dry season |
| Potrerillos | Well field in San Antonio de Belén and San Rafael de Alajuela, across from Proyecto Gol | Guachipelín south of Route 27 | Positive balance of 47.4 liters per second |
| Puente Mulas | The largest system, which also supplies Santa Ana and reaches Alajuelita | Guachipelín north of Route 27, Escazú Centro, San Rafael | 1,258 liters per second average production against demand of 2,205 |
| Lajas | Small local system | Calle Lajas, north to near Súper Aguimar | 6.5 liters per second against 6.35 demand |
San Rafael, Escazú Centro and northern Guachipelín are among the canton's most sought-after addresses, and all three are on Puente Mulas, the system that showed the widest gap between production and demand in AyA's 2024 figures. In San Antonio, the Los Filtros plant was running just short of peak-season demand. Southern Guachipelín, on the Potrerillos wells, was the one large area AyA described with a surplus.
AyA also told the council that it had been taking the small springs south of Escazú out of service, because they were small and expensive to treat. Bebedero and El Carmen now get Puente Mulas water. Neighborhoods that once had their own local source now depend on the same system as Escazú Centro and San Rafael, so more of the canton is on Puente Mulas than the district names suggest.
The Potrerillos side has its own setup. AyA explained that its water comes from Santa Ana by pumping and arrives at the Cementerio tank, where the institution also has a plantel. In the same presentation, AyA described Bello Horizonte as depending on a pumping line from Puente Mulas 2. A planned tank at Entierrillos was meant to let mid-Escazú receive water by gravity instead. In practice, whether a house gets water by gravity or by pump, and from which tank, is part of the answer to "where is this home?"
When AyA warned in January 2024 that up to 400,000 people could face dry-season supply controls, La Nación reported that Escazú, Alajuelita and Desamparados were expected to be affected first. The same report said AyA would set schedules by elevation, so higher areas could lose water earlier and get it back later than lower ones. For a canton that climbs from the Route 27 flats into the Cerros de Escazú, the higher-elevation views that buyers pay for come with that pattern.
The next year went differently. On April 9, 2025, El Mundo CR reported AyA's statement that it had gone through the first five months of that dry season without rationing nationwide. In June 2025, a scheduled maintenance cut that left the Puente Mulas I and II pumping stations out of service covered Escazú Centro, San Antonio, San Rafael, Guachipelín, Trejos Montealegre and Bello Horizonte at once, according to El Financiero. Work on one system reaches across most of the canton, even in a year without rationing.
The 2026 rainy season did not refill the region the usual way. In August, El Observador reported that the IMN expected El Niño to reach "very strong" intensity from September through November. The IMN's forecast ran to February 2027 and confirmed meteorological drought across the Central Valley, with rainfall about 50% below normal there from September to November. IMN climatologist Karina Hernández told the outlet that ocean temperature readings were then above those of the 2015 event, which peaked at 2.8°C.
The issue was already on the canton's agenda before the forecast. At the council session of June 16, 2026, residents presented a letter with more than 100 signatures about recurring cuts and low pressure. It cited more than 19 hours without water in Barrio El Carmen on Friday, June 12. A council member described Bello Horizonte going about a day and a half without water after a pipe repair failed. The same session recalled a motion the council approved unanimously on May 26, 2026, to begin talks on a municipal mixed public-services company for drinking water and wastewater, modeled on Heredia's ESPH. That proposal is a long-term plan. Through this dry season, Escazú's water still comes from the AyA systems in the table above.
In the March 2024 presentation, AyA laid out a set of projects aimed at the weak points described above. Two Proyecto Gol wells had been drilled and connected by a 500-meter, 500-millimeter pipeline. Their pumping and electrical equipment was still in procurement, and the wells were expected to add 110 liters per second at a cost of about ₡2.796 billion. A 500-millimeter bypass from La Paco toward Puente Mulas 2 was already built, able to move up to 300 liters per second to support Bello Horizonte, Alajuelita and, if needed, Escazú Centro.
AyA also described the Entierrillos tank as designed but still going through adjustments, at 2,800 cubic meters, and a 1,670-meter pipe replacement on Calle San Miguel estimated at ₡236 million that was awaiting budget approval. AyA's public project dashboard lists the tank as "Tanque Entierrillos 2 600 m³." Earlier pipe work in 2024 had already replaced 720 meters of line and 59 service connections on Calle Villalobos, Pablo Campana, Bebedero, Magia Verde and Calle El Alto. If a home you are considering is on one of those streets, or near a planned tank, ask the seller what has changed on the street since then.
In Escazú, ask which system a home is on, whether it sits high or low within that system, and how much storage the house has between the street main and the kitchen tap. Two homes can show equally well on a sunny December afternoon and still draw on systems with very different 2024 balances.
Ask sellers how the home has held up during past cuts, including the canton-wide maintenance cut of June 2025. Ask whether the property has its own storage tank and pump, how large the tank is and where it sits. These are physical facts about the house, and an inspection can confirm them. Seeing a home in the late dry season, when systems are under the most strain, tells you more than the same visit in July. Our earlier piece on timing tours in Escazú's dry season covers the calendar side of that.
Storage is also one of the few parts of a home's water supply an owner can change. If a home you love is on a stretched system or at the top of a slope, storage and pumping can go into the renovation plan, and our construction side can oversee that work from purchase through delivery. Bryana Conway can help you compare Escazú homes this dry season with the water system behind each one in view. Let's Connect.
Stay up to date on the latest real estate trends.
Partner with a dedicated real estate professional who combines creativity, expertise, and a deep understanding of clients' needs. Whether buying, selling, or designing, the focus is always on making dreams a reality with personalized, thoughtful service.